Respuesta :
Answer:
Determine the plantwide overhead rate for Laval using direct labor hours as a base. Â
1. Estimated overhead costs  $800,000  $1.60  per direct labor hour
Estimated direct labor hours  500,000 Â
2. Determine the total manufacturing cost per unit for the aluminum desk lamp using the plantwide overhead rate.
Direct Labor - Assembly  $188,500
Direct Labor - Fabricating  395,200
Direct materials  270,000
Overhead  34,720
Total manufacturing costs  888,420
Units produced  22000
Manufacturing cost per unit  40.38
3. Â Compute departmental overhead rates based on machine hours in the fabricating department and direct labor hours in the assembly department.
          Departmental overhead rate Â
Fabricating  390000/152000 = 2.57  MH
Assembly  410000/290000 = 1.41  DLH Â
4. Â Use departmental overhead rates from requirement 3 to determine the total manufacturing cost per unit for the aluminum desk lamps. Â Â
Direct materials                             270000 Â
Direct labor  Â
Fabricating                  188500 Â
Assembly                  395200 Â
                                         583700
                                            0
Overhead  Â
Fabricating (15000*2.57) Â Â Â Â Â Â Â 38550 Â
Assembly (15200*1.41) Â Â Â Â Â Â Â Â Â Â Â Â 21432 Â
                                            59982
                                              0
Total manufacturing cost                          913682
Units produced                                   22000
Manufacturing cost per unit                         41.53  per unit